Condo and HOA Roof Replacement in Schaumburg

How condo and townhome associations near Schaumburg decide, fund and schedule a roof replacement, and the questions owners and boards should put to the roofer.

Illustration for the guide "Condo and HOA Roof Replacement in Schaumburg" (Schaumburg, IL)
Short answer

In a condo or townhome association the roof is usually a common element, so the board decides, funds and schedules the replacement under the governing documents. Owners should ask for the reserve study, the written scope, the bids, the roofer's Illinois license number and the schedule. Buildings above eight units need an Unlimited roofing license.

Key takeaways

  • In most associations the roof belongs to the common elements, so the board, not the individual owner, decides when and how it is replaced; read the declaration and bylaws to confirm.
  • Funding usually comes from the reserve fund, sometimes topped up with a special assessment or a loan; a reserve study estimates when and how much, and owners can ask to see it.
  • Compare bids on one written scope, with layers, decking allowance, flashing, ventilation, permit and the roofer's Illinois license number listed, not on totals alone.
  • Illinois licenses roofers in two classes; a residential building of eight units or fewer can use either, while a larger building needs an Unlimited licensee.
  • A whole building or row is normally reroofed together, in a sequence that follows reserves and weather, so owners at the end of the line should ask how interim leaks will be handled.

Who decides about the roof in a condo or townhome community?

The association board, acting under the declaration, bylaws and Illinois law. The roof is generally a common element, so an individual owner cannot hire a roofer for it without the board's approval. Owners usually have a voice through votes, especially on special assessments, and a right to see records.

Schaumburg's growth makes this a local question. International Village, opened in 1967, was the village's first major multifamily project, and later decades added townhome and condo communities across the village and in neighboring Glendale Heights, Hanover Park and Wheeling. The buildings sit at different points in their roof cycles, and many boards are now making a second replacement decision.

If you are an owner with a leak, report it to the board or manager in writing, with dated photographs. Do not authorize roof work on common elements yourself, because you may not be reimbursed and may create a dispute. The condo and townhome roofing page describes the work from the roofer's side.

Townhome rows add another feature: each building is a long strip of attached units, with a single ridge and eave line crossing many owners. A leak at one end of a strip can be traced to a flashing joint several units away, which is why a survey of the whole building is more informative than a look at the unit that reported the stain.

How do associations decide it is time?

Most use a mix of a reserve study, a roof survey and the pattern of leaks and repairs. A reserve study projects the roof's remaining life and the cost to replace it, a survey by a roofer rates the condition, and rising repair bills often tip the decision. The board should be able to show the evidence to owners.

Ask whether the reserve study is current. Costs move, and a study done years ago may understate what the project will take. Ask also whether a roofer has surveyed each building, since buildings of the same age can differ in condition depending on exposure, ventilation and past repairs.

A written survey with photographs and a rating by building is a useful tool for sequencing. It lets the board start with the worst buildings and spread the rest across seasons. See the roof inspection page for what a good report includes.

It is also reasonable to ask whether ventilation and attic insulation have been looked at as part of the scope. Replacing the shingles without addressing a poorly ventilated shared attic is a common reason for the same roof to disappoint twice.

How is the project funded?

Usually from the reserve fund built up through regular assessments, supplemented where needed by a special assessment, a loan or a phased schedule. The board decides within the governing documents, and owners should ask how much is in reserve, how much is needed, and how any shortfall will be covered and by when.

A shortfall is common, and the response differs by association. Some levy a one-time assessment, some borrow and repay through higher dues, and some phase the work across several years. Each choice shifts cost between current and future owners, which is a fair thing to raise at a meeting.

This guide does not state any assessment amounts or legal limits. Those depend on your documents and on Illinois law, and the association's attorney or manager is the person to ask.

What are the stages, and who does what?

Survey, scope, bids, selection, contract, permit, notice to owners, installation, inspection and close-out. The board owns the decisions, the manager coordinates, and the roofer carries out the work and the paperwork. Each stage has a question worth asking, and the table sets them out.

Delays tend to come from the early stages, where the scope is vague or the funding is not in place, and from the middle, where owners are not told what to expect. A clear sequence helps everyone.

Stages of a condo or townhome roof replacement, who leads each, and a question to ask.
StageWho leadsQuestion to ask
Survey and reserve reviewBoard and manager, with a rooferIs the reserve study current, and is each building rated?
Written scopeRoofer, reviewed by the boardDoes every bidder get the same scope?
Bids and selectionBoardAre license numbers, insurance and references verified?
ContractBoard and its attorneyAre payment terms, schedule and change orders written down?
PermitRooferWho applies, and is the fee in the price?
Owner noticeManagerHow many days' notice, and what must owners do?
InstallationRooferWhat happens if weather delays the building sequence?
Inspection and close-outRoofer and the villageWho keeps the permit and inspection records for the association?

What should the board ask a roofer before signing?

The Illinois license number and class, proof of insurance, references from comparable buildings, the permit plan, the schedule, the decking allowance, how many layers are expected and how hidden damage is priced. A building of more than eight units needs an Unlimited licensee, and the number must appear on the contract.

The license guide explains how to verify a number, and the permit guide describes what is known about Schaumburg and Carol Stream. Schaumburg requires a reroof permit for residential work and a copy of the state license, and registers out-of-town contractors. Other villages differ.

Ask also how the roofer will protect common areas: walkways, parking, landscaping and entrances. Ask what notice owners will receive, who they call during the work and how debris, nails and noise are managed.

How should the board compare bids and run the owner side of the work?

Give every bidder the same written scope, ask each to itemize layers, decking allowance, flashing, ventilation, permit and cleanup, and compare line by line. Then tell owners what to expect: the order of buildings, the days of noise, what to move, and who to call. Clear notice prevents most disputes.

A lower bid that omits the decking allowance or the permit is not cheaper, only incomplete. Ask the low bidder what was left out, and ask every bidder how they handle hidden damage and weather delays. References from buildings of similar size in the area are worth calling, and the board can ask to see a finished building from the previous season.

On the owner side, a one-page notice for each building works well: the expected dates, what must be moved from balconies and attics, parking arrangements, and a phone number for questions. Owners who work from home or have pets should be able to flag it early. Keep a record of the notices sent.

Finally, keep the paperwork: the contract, the permit, the inspection result, the product and grade installed, the photographs of replaced decking and the roofer's license number. The next board will need them, and so will a buyer's lender.

  • Same written scope for every bidder
  • License number, class and insurance proof checked for each
  • References from comparable buildings
  • Itemized layers, decking allowance, flashing and ventilation
  • Permit responsibility and fees
  • Schedule, building order and weather plan
  • Notice to owners and a contact for questions
  • Close-out records filed with the association

Why is a whole building or row usually done together?

Because the roof is continuous across the units, shares walls and details, and a mix of old and new sections leaks at the joins. One crew and one system across a building also give uniform appearance and drainage. Phasing happens between buildings, not within one.

Phasing across buildings is common when the reserve is limited. A roofer can price a multi-year program and hold the scope constant, but the board should record how each year's price will be set and what happens if the program is interrupted.

Rows of townhomes also share ridges, valleys and sometimes chimneys. Flashing at firewalls and party walls needs particular care, and should be named in the scope. The flashing repair page explains why.

What about leaks between units, insurance and ice dams?

Report a leak to the board first. The roof is generally the association's responsibility, while interior damage may be the owner's or the association's depending on the documents and the insurance. A roofer fixes the roof source; who pays for interior repair is a question for the documents and the insurers.

Ice dams are a common winter problem on association buildings, with long eaves and shared attic spaces. The cause is the same as on a house, heat in the attic, and the cure is the same sequence, but a shared attic means coordination among owners. See the ice dam guide.

Keep records: dates, photographs, whom you told and when. If a claim is likely, keep wet materials until an adjuster has seen them. Whether an insurer pays is its decision under the policy.

Frequently asked questions

Can I hire my own roofer for the roof over my unit?

Usually not. If the roof is a common element, the association controls it. Check the declaration, and report problems to the board in writing.

How many bids should a board get?

More than one, all against the same written scope. This site does not set a number. Ask the manager or the association's attorney for the board's own policy.

Will owners have to pay a special assessment?

That depends on the reserve and the board's funding choice. Ask to see the reserve study and the plan for any shortfall.

Does the roofer need access to my unit?

Sometimes, to inspect the attic or the ceiling below a leak. The board or manager coordinates access and notice.

What license does the roofer need for my building?

A building of eight residential units or fewer can use a Limited or Unlimited license. A larger building needs an Unlimited license. Check the number in the state look-up.

Sources

  1. Wikipedia – Schaumburg, Illinois
  2. Wikipedia – Glendale Heights, Illinois
  3. Wikipedia – Wheeling, Illinois

This guide is general information for Cook County homeowners, not a substitute for an on-site inspection. Prices are estimates. See our disclaimer.